Publications

Publication Keywords

Filters

Filter By 

select
OR OR

Then By 

select
Default View: 

Review Drafts
IDEd.PublishedTitle
Data pager
Data pager
Page size:
PageSizeComboBox
select
 136 items in 5 pages
D-13005-1 1  SC19-017, CGA M-4 (13-005), Due 6 May 2019
D-14010-2 2  SC18-043, P-62, Sea Transport of MEGCs and Portable Tanks, Due 9/21/18
D-15043-0 1  Draft of EIGA Doc 2##/CGA P-83 for membership review (as of 22 Oct 2018)
D-15043-1 4  Standards Council Ballot SC19-016, CGA P-83 (new), due 6 May 2019
D-15123-1-1 1  [A-1127] Draft of EIGA TB/CGA PS-58, Acetylene Plant Safe Operating Pressures and Temperatures PC Cutoff: 26 Apr 2019
D-17002-1 1  G-5.4 PC Development Draft (30 Aug 2018)
D-17024-1 1 16 May 2019 DRAFT SC19-024 Ballot, P-5 Suggestions for the Care of High Pressure Air Cylinders for Underwater Breathing, Due 17 June 2019
D-17029-1 1 16 May 2019 Data entry error
D-17035-1 1  SC19-020, P-2 (17-035) Draft, Due 13 May 2019
D-17041-1 1 22 Apr 2019 E-6 Tech Comment Review/Adjudication (as of 5 Apr 2018)
D-17048-1 1 26 Apr 2019 DRAFT Standards Council Ballot SC19-022, C-10, Guidelines to Prepare Cylinders and Tubes for Gas Service and Changes in Gas Service App w/comment
D-17084D-1-1 1  Draft of two new safety posters for TF review (as of 180808)
D-17084E-1 2  Second draft of two new safety posters for task force review (as of 181105)
D-17084F-1-1 1  Drafts of two new safety posters for task force review (as of 190228)
D-17084G-1 1  Standards Council Ballot SC19-029, Five draft new safety posters (X02-X06)
D-17085-1 1  Draft of M-23, Standard for Regulatory Classification of Medical Device Gases, PC cutoff 6 Mar 2019
D-17099-1 2  Draft of CGA H-15, Safe Catalyst Handling [A-1129] for Membership Review PC Cutoff Date 22 Jul 2019
D-17118-1 1  Draft of Repurposing of Industrial Gas Equipment into Natural Gas Service with Technical Comments
D-18001-1 1 22 Apr 2019 SC19-021, G-1.9, Solvent Lvl in Acetylene Cyl. Due 22 May 2019
D-18004-1-1 2 28 Feb 2019 DRAFT Standards Council Ballot SC19-026, C-6.3, Inspection of LP AA Compressed Gas Cylinders Due 18 June 2019
D-18010-1 1  Standards Council Ballot SC19-010, Draft of CGA PS-7, ballot due 26 April 2019
D-18012-1 1  SC19-018 ballot, V-5 (18-012), Due 8 May 2019
D-18014-1 4  Draft of M-6 (18-014) as of 30 Oct 2018 PC Development Meeting
D-18015-1 1  Draft of SB-31 (18-015) as of 26 Jul 2018
D-18018-1 1  P-30 Tech Comment Rev/Adj (as of 4/6/18)
D-18020-1 1  DRAFT SB-36 for AHC e-ballot DUE 7 September 2018
D-18036-0 3  Draft of E-18 (18-036) as of 20 Sept 2018
D-18045-1 1  SC19-013 P-11 (18-045), Due 2 May 2019
D-18053-1 2 05 Mar 2019 DRAFT Bulk LOX, LIN, LAR Storage Systems at Production Sites 2 week review DRAFT (comments due 17 June 2019)
D-18054-1 1 10 Jun 2019 DRAFT - WORDPIPE - Revision of C-17, Methods to Avoid and Detect Internal Gas Cylinder Corrosion - DRAFT 10 June 2019